Environmental
00%
Environmental field technician collecting soil samples on an active site
Service · Environmental

Find it before the closing.

Phase I and II assessments, soil and groundwater sampling, and asbestos, lead and air monitoring — the due diligence that determines whether a site is a liability or an opportunity.

Scroll to read
Assessment · sampling · monitoring
01
The Brief

Contamination does not appear on a survey. It appears in the sample.

Environmental risk stays invisible until someone tests for it — and by then it is either a manageable finding or a stop-work order. Lenders, buyers and agencies all require the same thing: a documented investigation performed to a recognized standard.

Universal performs environmental assessment and monitoring alongside its own drilling fleet and accredited laboratories, so subsurface sampling, analysis and interpretation stay inside one firm and one chain of custody.

Assessed. Sampled. Documented.

02
Capabilities

What we investigate.

Assessment, sampling and monitoring across property transactions, construction and building materials.

01
Phase I assessments
Records review, site reconnaissance and interviews to identify recognized environmental conditions.
ASTM E1527
02
Phase II investigations
Subsurface sampling of soil, groundwater and soil vapor to confirm or rule out suspected conditions.
ASTM E1903
03
Soil & groundwater sampling
Sampling programs run with our own rigs, under chain of custody to accredited analytical laboratories.
Drilling & laboratory
04
Asbestos surveys
Building material inspection, bulk sampling and abatement monitoring by licensed inspectors.
Licensed
05
Lead & hazardous materials
Lead-based paint inspection, risk assessment and hazardous building material screening.
Building materials
06
Air & perimeter monitoring
Dust, particulate and perimeter air monitoring during abatement, demolition and excavation.
Monitoring
Subsurface investigation

What the boring answers that a walkover cannot.

Records and reconnaissance stop at the ground. Below grade there is one way to know what is there and how far it has gone: drill it, sample it, and log every depth.

Step 1 / 4

Drag to orbit · Arrow keys to step · Geometry is diagrammatic; depths and concentrations shown are illustrative, not measured values.

What an environmental boring finds

    Five layers, one release
    LayerWhat it tells the engineer

    Environmental drilling, soil sampling and monitoring well installation by Universal Testing & Inspection Services, Inc. — West Babylon, NY · Miami, FL · est. 1992.

    03
    Deliverables

    What the lender asks for.

    PHASE I
    Assessment report
    A conforming assessment identifying recognized environmental conditions, or stating there are none.
    PHASE II
    Analytical findings
    Laboratory results compared against the applicable regulatory standards, with findings stated plainly.
    COC
    Chain of custody
    Documented handling from sample collection to laboratory receipt for every specimen.
    SURVEY
    Asbestos survey
    Material inventory, sample results and quantities sufficient to scope abatement.
    AIR
    Monitoring logs
    Daily perimeter and personal air results recorded through abatement or demolition.
    CLOSE
    Closure documentation
    Regulatory filings and closure reports for well abandonment and remedial work.
    04
    How We Work

    Records, samples, results, position.

    Environmental work is a legal record before it is a technical one, so we build it that way.

    01
    Records & reconnaissance
    Historical records, agency databases and a site walk establish what to look for before anything is sampled.
    02
    Sampling plan
    A written plan sets sample locations, depths, analytes and standards, so results are defensible against a method.
    03
    Field sampling
    Our own crews collect soil, groundwater and vapor samples under documented chain of custody.
    04
    Laboratory analysis
    Samples are analyzed by accredited laboratories against the applicable regulatory criteria.
    05
    Interpretation & position
    A licensed professional states what the results mean for the transaction, the permit or the construction sequence.

    A finding disclosed early is a negotiation. The same finding discovered later is a claim.

    Where to next

    Buying, refinancing or breaking ground?

    Send the address and the transaction timeline. We will confirm the appropriate scope and turnaround within one business day.