Towers, mixed-use development, healthcare and higher-education construction.
Vertical construction pours on a cycle. A concrete result that arrives two days late is a result that arrives after the next floor is formed, and a strength question at that point is an expensive one. Healthcare and higher-education work adds phasing around occupied buildings and their own inspection regimes.
We staff high-rise programs continuously rather than by call-out, cure on site where the cycle demands it, and hold the NYCDOB Class 1 categories these buildings are inspected under.
Poured Monday. Reported Monday.
Service lines scoped to the realities of this sector.
Field sampling and laboratory breaks on the pour cycle, from mat foundation to topping slab.
AASHTO R18 · CCRL
The Class 1 category list a New York building is signed off against, including the TR1.
NYCDOB Class 1
Cylinders cured and broken on your site when the cycle will not wait for a courier.
ASTM C31 · C39
Aerial capture and close visual inspection on elevations that would otherwise need swing staging.
FAA Part 107
Forensic investigation, sealed repair design and expert testimony when a condition is disputed.
PE licensed in 13 states
Tell us the scope and the schedule. Our team responds within one business day — with the license numbers to back it up.