Markets
00%
Commercial & Institutional
Commercial & Institutional

Towers, hospitals and campuses, floor by floor.

Towers, mixed-use development, healthcare and higher-education construction.

Scroll to read
Supertalls · healthcare · higher education
01
The Brief

On a tower, testing is a schedule problem before it is a technical one.

Vertical construction pours on a cycle. A concrete result that arrives two days late is a result that arrives after the next floor is formed, and a strength question at that point is an expensive one. Healthcare and higher-education work adds phasing around occupied buildings and their own inspection regimes.

We staff high-rise programs continuously rather than by call-out, cure on site where the cycle demands it, and hold the NYCDOB Class 1 categories these buildings are inspected under.

Poured Monday. Reported Monday.

Commercial & Institutional
02
Capabilities

What we cover on a building program.

Service lines scoped to the realities of this sector.

Concrete & steel testing

Field sampling and laboratory breaks on the pour cycle, from mat foundation to topping slab.

AASHTO R18 · CCRL

Special & progress inspections

The Class 1 category list a New York building is signed off against, including the TR1.

NYCDOB Class 1

Mobile laboratory support

Cylinders cured and broken on your site when the cycle will not wait for a courier.

ASTM C31 · C39

Facade & roof inspection

Aerial capture and close visual inspection on elevations that would otherwise need swing staging.

FAA Part 107

Support engineering

Forensic investigation, sealed repair design and expert testimony when a condition is disputed.

PE licensed in 13 states

03
Selected Work

Recent projects in this market.

Where to next

The next decade is already on the schedule.

Tell us the scope and the schedule. Our team responds within one business day — with the license numbers to back it up.