Generating stations, substations, pipelines and utility corridors under continuous service.
Utility work carries constraints the rest of construction does not: energized equipment, restricted access, and an outage window that was scheduled a year in advance and will not move. Foundations for transformers and turbines are massive, heavily reinforced and unforgiving of a late result.
We scope our crews and laboratory turnaround to the outage, and we bring nondestructive methods to structures that cannot be cored or taken out of service.
Inside The Outage Window.
Service lines scoped to the realities of this sector.
Mass concrete, grout and anchor systems under transformers, turbines and switchgear.
AASHTO R18 · CCRL
UT, MT and PT weld evaluation on pressure and structural components that stay in service.
ASNT Level II & III
Rebar, conduit and duct-bank location before anyone cuts into an energized site.
Know before you cut
Borings and monitoring wells along pipeline and transmission corridors.
ASTM D1586
Phase I and Phase II work on generating sites and substation parcels.
ASTM E1527 · E1903
Tell us the scope and the schedule. Our team responds within one business day — with the license numbers to back it up.