Warehouses, distribution centers, manufacturing plants and heavy equipment foundations.
Warehouses and plants live or die on subgrade preparation and slab performance. Racking loads, forklift traffic and machine foundations all transfer straight into the ground, and flatness tolerances that read as a technical footnote at bid become an operations problem on day one.
We test the subgrade before it is covered, verify the slab as it is placed, and investigate the fill and bearing conditions underneath before the building is designed around them.
Built On What's Underneath.
Service lines scoped to the realities of this sector.
In-place density and moisture control across the building pad before the slab goes down.
AASHTO R18
Concrete sampling, strength verification and flatness observation on large placements.
CCRL accredited
Reinforcement, anchor bolt and grout inspection under heavy equipment bases.
NYCDOB Class 1
Borings and test pits to define bearing capacity and settlement before design is fixed.
ASTM D1586
Phase I and Phase II assessments on industrial parcels and former manufacturing sites.
ASTM E1527 · E1903
Tell us the scope and the schedule. Our team responds within one business day — with the license numbers to back it up.